Laing O’Rourke (Defence) · Shoalwater Bay Military Training Area, QLD
ASMTI Precinct C Bulk
Earthworks and Tunnel
Project overview
Bulk earthworks for the Precinct C Eastern Urban Operations Live Fire facility (work package WP10009), bringing the site to subgrade level, plus a subterranean training tunnel and a stormwater diversion channel. The tunnel was built from large precast units placed by a 130 t crane to an RPEQ-certified design and methodology.
Completed ahead of the date for practical completion, with no liquidated damages applied.
- imported embankment fill
- 100,000 t
- building pads
- 30
- precast tunnel units
- 56
- ground surface treatment
- 43,000 m²
Scope of works
- Geotechnical investigation of uncontrolled fill under an RPEQ subconsultant
- Stormwater diversion channel over 500 m long with 2,200 m³ of rock protection
- 30,000 m³ of bulk cut to fill and 100,000 t of imported Class A2 embankment fill
- 30 building pads and 4 road boxes to +0/-25 mm tolerance
- Subterranean tunnel of 56 precast units including 19 RCBC units and multiple chambers
- Two sediment basins, topsoil and hydromulch with temporary irrigation
Project gallery
Bellequip managed the construction works effectively and ensured all aspects of site management such as safety and environmental controls were installed prior to commencing works