Project overview

A Black Spot-funded safety upgrade of Baileys Lane near Biloela. The problem sections (a corner, a curve and the floodway approaches) were stabilised and widened, and new drainage culverts were installed, all to Capricorn Municipal Development Guidelines standards.

sections stabilised and widened
3

Scope of works

  • Stabilisation and widening at the corner (CH1260–1345)
  • Stabilisation and widening at the curve (CH2300–2480)
  • Stabilisation and widening of the floodway approaches (CH4285–4960)
  • Supply and installation of RCBC and RCP culverts, including 375 mm RCP
  • Manufactured gravel, geosynthetics, lime and stabilising agent to TMR specification
  • Set-out, before/after and as-constructed survey with NATA compliance testing

Project gallery

  • Excavator trimming the subgrade to final level
  • Backfilling around a new culvert
  • Stabiliser mixing binder into the widened pavement
  • New rock-protected batter
  • Excavator loading a tipper while shaping the table drain
  • The finished sealed road with its rock-protected batter