ASMTI’s highest-value civil package
Laing O’Rourke (Defence) · Shoalwater Bay
Construction of the Bulk Logistics Road and Node, the Stanage Bay Road intersection and a car park, plus dump remediation and road maintenance on Stoodleigh and Stanage Bay roads, delivered through bushfires, flooding and the COVID-19 pandemic, and completed on the contracted date.
- multi-layer road pavement construction
- 15 km
- up to 7-cell 3.6 m × 3 m link slab culverts
- 11 culverts
- MRTS39 & MRTS40 concrete pavement
- 2,100 m³
- imported fill
- 90,000 m³
- pavement material
- 80,000 m³
- rock excavation including blasting
- 10,000 m³
Laing O’Rourke (Defence) · Shoalwater Bay
1.9 km of road, 25,000 m² of hardstand and 1.4 km of in-ground electrical, communications, water, compressed air, drainage, sewerage and trade waste services to a greenfield site, featuring bulk earthworks with cut and fill over 5 m and rock excavation to 4 m. Completed ahead of the contracted date.
Laing O’Rourke (Defence) · Three work packages
Works across various sites over 80 km, including a sealed car park, batch plant pad, security checkpoint, clearing, grubbing and mulching, ground surface treatment, bulk earthworks, a major stormwater diversion channel, subterranean tunnel infrastructure, pavements, detailed earthworks and road maintenance.